26.10.2023 -06.12.2023

The project of changing the operating conditions of the petroleum products storage facility of "San Petroleum Georgia" LLC in Samtredia with a capacity of 2900 m3 (with an annual cargo turnover of 24,000 m3)

City Samtredia
The project of changing the operating conditions of the petroleum products storage facility of "San Petroleum Georgia" LLC in Samtredia with a capacity of 2900 m3 (with an annual cargo turnover of 24,000 m3)
24.10.2023 -04.12.2023

The project of changing the operating conditions of the metallurgical enterprise in Rustavi by "Geo Enterprise" Ltd.

City Rustavi
The project of changing the operating conditions of the metallurgical enterprise in Rustavi by "Geo Enterprise" Ltd.
10.11.2023 -30.11.2023

Scoping report for the construction and operation of a 50 MW installed capacity solar power plant and a 110 KW electric power plant in the vicinity of the village of Yagluja of Energy Solutions 2 LLC

City Marneuli
Scoping report for the construction and operation of a 50 MW installed capacity solar power plant and a 110 KW electric power plant in the vicinity of the village of Yagluja of Energy Solutions 2 LLC
17.10.2023 -29.11.2023

110 kV power transmission line construction and operation project by "Chalik Georgia Wind" LLC

Village Khidistavi
110 kV power transmission line construction and operation project by "Chalik Georgia Wind" LLC
17.10.2023 -29.11.2023

110 kV power transmission line construction and operation project by "Chalik Georgia Wind" LLC

City Gori
110 kV power transmission line construction and operation project by "Chalik Georgia Wind" LLC
17.10.2023 -28.11.2023

110 kV power transmission line construction and operation project by "Chalik Georgia Wind" LLC

Village Nigoza
110 kV power transmission line construction and operation project by "Chalik Georgia Wind" LLC
17.10.2023 -28.11.2023

110 kV power transmission line construction and operation project by "Chalik Georgia Wind" LLC

Village Kvakhvreli
110 kV power transmission line construction and operation project by "Chalik Georgia Wind" LLC
09.11.2023 -28.11.2023

The scoping report of the construction and operation of the 16,62 MW installed capacity ‘’KAMARA Hesi’’ by LTD ‘’Kamara Energy’’ on the river Tergi

Village Sioni
The scoping report of the construction and operation of the 16,62 MW installed capacity ‘’KAMARA Hesi’’ by LTD ‘’Kamara Energy’’ on the river Tergi
09.11.2023 -27.11.2023

The scoping report of the construction and operation of the 16,62 MW installed capacity ‘’KAMARA Hesi’’ by LTD ‘’Kamara Energy’’ on the river Tergi

Village Goriscikhe
The scoping report of the construction and operation of the 16,62 MW installed capacity ‘’KAMARA Hesi’’ by LTD ‘’Kamara Energy’’ on the river Tergi
17.10.2023 -27.11.2023

"Eco Green Space" LLC's project for setting up and operating a hazardous and non-hazardous waste incineration plant

Village Patara Foti
"Eco Green Space" LLC's project for setting up and operating a hazardous and non-hazardous waste incineration plant
  • ««
  • «
  • …
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • …
  • »
  • »»