12.08.2022 -
09.09.2022
Change in operating conditions of high-voltage overhead power transmission lines and substations of JSC "Energo-Pro Georgia" Kvemo Kartli branch in Bolnisi municipality (change of the section corridor from "Tandziamast N69 to tower N85)
Village Geta
07.09.2022 -
07.09.2022
On the cancellation of the public discussion of the project for the extraction of 81,766 tons of clay-gypsum (gypsum) minerals near the village Akhali Samgori."Ginus" LLC. Gardabani Municipality
City Tbilisi
18.08.2022 -
02.09.2022
Construction and operation project of an asphalt plant, mineral processing, and bitumen reservoirs by "New Geo Road" LLC
Village Kizilajlo
12.08.2022 -
31.08.2022
The project of extracting useful minerals (peat) by "Etalon" LTD
Village Gandza
11.08.2022 -
30.08.2022
The project of changing the conditions of operation of the cement enterprise of "T ES Group" LLC, Tetritskaro municipality in Village Marabda
Village Akhali Marabda
07.07.2022 -
29.08.2022
In Batumi, on the territory of the open warehouse for dry goods of "Kargo Parseli" LLC, the arrangement and operation of a storage facility for fossil fuels, oil products, and chemical products
City Batumi
09.08.2022 -
25.08.2022
Construction and operation of plastic waste processing plant by ‘’Tbilpolimeri" JSC in Tbilisi
City Tbilisi
05.08.2022 -
24.08.2022
Arrangement-exploitation project of "Arali" LLC asphalt production and storage of petroleum products
City Akhalcikhe
04.08.2022 -
22.08.2022
5.22 MW in Lentekhi municipality, on the Khofur river. The project for the construction and operation of "Khofuri 1 HPP" with a capacity of 35 kV EGX withdrawal project
Village Khofuri
21.07.2022 -
19.08.2022
The project of changing the operating conditions of the cement enterprise "Gia_2019" LLC, in Rustavi
City Rustavi
««
«
…