20.03.2023 -03.04.2023

Change in the conditions of operation of the cement enterprise "Lev 2019" LLC in Rustavi Municipality

City Rustavi
Change in the conditions of operation of the cement enterprise "Lev 2019" LLC in Rustavi Municipality
16.03.2023 -31.03.2023

construction and operation of "Lesulukhe HPP" with a capacity of 5.0 MW on the Tsachkhur River by "Lesulukhe HPP" LTD

Village Salkhino
construction and operation of "Lesulukhe HPP" with a capacity of 5.0 MW on the Tsachkhur River by "Lesulukhe HPP" LTD
16.03.2023 -30.03.2023

The project of changing the conditions of operation of the ferroalloy enterprise (increasing productivity) and laying the 110 kV power line to "Carbon"

Village Kvakhchiri
The project of changing the conditions of operation of the ferroalloy enterprise (increasing productivity) and laying the 110 kV power line to "Carbon"
16.03.2023 -29.03.2023

The project of changing the conditions of operation of the ferroalloy enterprise (increasing productivity) and laying the 110 kV power line to "Carbon"

Village Nakhshirgele
The project of changing the conditions of operation of the ferroalloy enterprise (increasing productivity) and laying the 110 kV power line to "Carbon"
16.03.2023 -28.03.2023

Construction and operation of the waste recovery technology line of "Plastik Adios" LTD in Ozurgeti Municipality

Village Meria
Construction and operation of the waste recovery technology line of "Plastik Adios" LTD in Ozurgeti Municipality
13.03.2023 -27.03.2023

Laying of a 110 kV overhead power line of CCIH Hydro VI LLC in Ozurgeti Municipality

Village Mtispiri
Laying of a 110 kV overhead power line of CCIH Hydro VI LLC in Ozurgeti Municipality
27.02.2023 -16.03.2023

The project of construction and operation of 5.45 MW of "Devash HPP" on the Devashi River by "United Power Energy" LLC

Borough Lentekhi
The project of construction and operation of 5.45 MW of "Devash HPP" on the Devashi River by "United Power Energy" LLC
09.02.2023 -14.03.2023

The draft of the change in the operating conditions of the 35 kV overhead power transmission line connecting the "Skhalta HPP" substation with the "Shuakhevi HPP" substation of "Ajaristskal Georgia" LTD

Borough Shuakhevi
The draft of the change in the operating conditions of the 35 kV overhead power transmission line connecting the "Skhalta HPP" substation with the "Shuakhevi HPP" substation of "Ajaristskal Georgia" LTD
27.01.2023 -06.03.2023

The project of setting up and operating a mineral (sand and gravel) processing enterprise in Chkhorotsku township by ‘’Riverstone’’ Ltd

Borough Chkhorotsku
The project of setting up and operating a mineral (sand and gravel) processing enterprise in Chkhorotsku township by ‘’Riverstone’’ Ltd
08.02.2023 -02.03.2023

Within the framework of the Tbilisi-Makhinjauri main railway modernization project of "Georgian Railways", the project of changes included in the project of the Moliti - Khashuri railway section.(including the planned km 20+760-23+060 section near the village of Zvare)

Village Zvare
Within the framework of the Tbilisi-Makhinjauri main railway modernization project of  "Georgian Railways", the project of changes included in the project of the Moliti - Khashuri railway section.(including the planned km 20+760-23+060 section near the village of Zvare)
  • ««
  • «
  • …
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • …
  • »
  • »»