26.09.2022 -12.10.2022

210 MW construction-operation project of a wind power plant and a 220 kV substation of JSC "Wind Power"

Village Dirbi
210 MW construction-operation project of a wind power plant and a 220 kV substation of JSC "Wind Power"
12.09.2022 -05.10.2022

Construction and operation project of the "Tbilisi HPP" LLC hydroelectric power station (Tbilisi HPP 20.2 MW) on the Mtkvari River

City Tbilisi
Construction and operation project of the "Tbilisi HPP" LLC hydroelectric power station (Tbilisi HPP 20.2 MW) on the Mtkvari River
06.09.2022 -04.10.2022

Construction and operation of a hydroelectric power station (Tskhenistskali 1 HPP) with an installed capacity of 22.74 MW on the river Tskhenistskali in Lentekhi municipality of "Hydro Invest G AS" LLC

Village Chikhareshi
Construction and operation of a hydroelectric power station (Tskhenistskali 1 HPP) with an installed capacity of 22.74 MW on the river Tskhenistskali in Lentekhi municipality of "Hydro Invest G AS" LLC
14.09.2022 -29.09.2022

The project for the construction and operation of the lime and combined fertiliser plant of "Elba Export" Ltd. in Rustavi

City Rustavi
The project for the construction and operation of the lime and combined fertiliser plant of "Elba Export" Ltd. in Rustavi
30.08.2022 -27.09.2022

The project of changing the conditions of operation of the ore beneficiation factory of "RMG Copper" (arrangement of new tailings)

Borough Kazreti
The project of changing the conditions of operation of the ore beneficiation factory of  "RMG Copper" (arrangement of new tailings)
30.08.2022 -27.09.2022

"Ginus" LLC, village of Gardabani Municipality. 81,766 tons of clay-gypsum (gaji) mineral extraction project near New Samgori

Village Akhali Samgori
"Ginus" LLC, village of Gardabani Municipality. 81,766 tons of clay-gypsum (gaji) mineral extraction project near New Samgori
09.09.2022 -26.09.2022

The project is to change the conditions of operation of the cement enterprise of ‘’T S Group’’ LLC in the village of Marabda in Tetritskaro municipality

Village Akhali Marabda
The project is to change the conditions of operation of the cement enterprise of ‘’T S Group’’ LLC in the village of Marabda in Tetritskaro municipality
29.08.2022 -23.09.2022

Change in operating conditions of the lime enterprise of Elba Export’’ LLC in Rustavi

City Rustavi
Change in operating conditions of the lime enterprise of Elba Export’’ LLC in Rustavi
16.08.2022 -22.09.2022

In Kutaisi, the project of changing the operating conditions of "Bajo" LTD leather processing enterprise started

City Kutaisi
In Kutaisi, the project of changing the operating conditions of  "Bajo" LTD leather processing enterprise started
29.08.2022 -21.09.2022

Project for the construction and operation of wastewater treatment plants and drainage systems of JSC "Adjara Water Alliance" in Khulo Municipality

Borough Khulo
Project for the construction and operation of wastewater treatment plants and drainage systems of JSC "Adjara Water Alliance" in Khulo Municipality
  • ««
  • «
  • …
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • …
  • »
  • »»